The story
The brief
Joe and Aisha’s primary bath had a cramped tub, one small sink and a floor that was cold for most of the year. They wanted a shower they could walk straight into and room for two in the morning.
What we did
We took the room back to the studs, lowered the floor for a curbless walk-in shower and waterproofed everything before the tile went down. Heated floors, a double vanity, new lighting and a quiet fan went in, and we kept the second bathroom working the whole time.
How it went
Every Friday they got a short update with photos, so they never had to chase us for news. The job came in at the price in the proposal, and the room was finished in four weeks.













